chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Evaporator Core > < A/C - Not Cold Enough/Inoperative|Page 7501
Page 1
background image

A/C Coupler O-ring: Service and Repair

Install new, approved service replacement air conditioning O-rings whenever a joint or a fitting is installed. The only exception is when the new
replacement components provide the O-rings. Unless service replacement O-rings of the specified part numbers are used, excessive leakage of 
Refrigerant-134A may occur. Refer to the part number for identification.

IMPORTANT:  Keep polyalkaline (PAG) refrigerant oil off the fitting threads. Long term contact of the oil on the threads may cause future
disassembly difficulties. Coat new air conditioning O-rings with mineral base 525 viscosity refrigerant oil just prior to installation. Slip the coated
O-rings onto the flange pipe in order to assure proper locating and sealing. Do not soak the O-rings in the mineral base 525 viscosity refrigerant oil in
order to prevent the possibility of swelling, and a reduction in sealing effectiveness.

Before installation, examine the O-rings and fittings in order to ensure that they have not been nicked or deformed. Replace nicked or deformed parts in
order to prevent refrigerant leakage.

Evaporator Core > < A/C - Not Cold Enough/Inoperative|Page 7501