chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Valve Cover|Specifications|Page 2103 > < Valve Cover|Specifications|Page 2101
Page 2
background image

1. Install the new cylinder head cover gasket (1) and four O-rings (2) to the cylinder head cover.

NOTICE:  Refer to Fastener Notice in Service Precautions.

2. Install the cylinder head cover (1) to the cylinder head (2). Secure the cover with six bolts.

^

Tighten the cylinder head cover bolts to 10 Nm (89 inch lbs.).

3. Install the secondary (spark plug) wires to the cylinder head cover and spark plugs.
4. Install the (PCV) valve and the PCV valve hose to the cylinder head cover.

5. Install the accelerator cable bracket (2) to the throttle body. Secure the bracket with one screw, one bolt and one nut.

^

Tighten the throttle body nut and bolt to 23 Nm (17 ft. lbs.).

6. Install the accelerator cable (3) and the kickdown cable (4) (automatic transmission equipped vehicles) to the throttle body bellcrank.
7. Adjust the accelerator cable as necessary. 
8. Adjust the kickdown cable (automatic transmission equipped vehicles) as necessary. 
9. Install the throttle cover to the intake manifold. Secure the cover with three bolts.

^

Tighten the throttle cover bolts to 15 Nm (11 ft. lbs.).

Valve Cover|Specifications|Page 2103 > < Valve Cover|Specifications|Page 2101