chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Charging System > < Positive, Battery Cable|Service Precautions|Page 6359
Page 3
background image

6. Install the battery positive wires to the fuse box noting the correct terminal routing.
7. Install the fuse box (1) to the right inner fender. Secure with the 3 bolts.

8. Install the ground wire to the bulkhead.
9. Connect the harness (1) retainers.

10. Install the positive battery cable to the positive battery terminal.

NOTE:  Refer to Fastener Notice in Service Precautions.

11. Install the negative battery cable to the negative battery terminal.

Tighten
Tighten the battery cable-to-battery terminals to 15 N.m (11 lb ft).

Charging System > < Positive, Battery Cable|Service Precautions|Page 6359