chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Front Subframe|Service and Repair|Page 11758 > < Front Subframe|Service and Repair|Page 11756
Page 9
background image

17. Install the underbody rear side rail. Refer to Underbody Rear Side Rail Replacement   ().

Note:  The engine and transmission mount nuts must be replaced once removed. When the nut has to be loosened or removed, threadlocker must
be used in addition to using a new nut. Allow adhesive on new engine and transmission mount nuts to cure for 24 hours after replacement. 

18. Apply threadlocker GM P/N 12345382 (Canadian P/N 10953489) to the engine and transmission mount threads.
19. Install the engine and transmission mount nuts and tighen to 75 Nm (55 lb ft).

20. Install the power steering cooler inlet pipe to the frame. Refer to Power Steering Cooler Pipe/Hose Replacement   (See: Maintenance/Hoses/Power

Steering Line/Hose/Service and Repair/Power Steering Cooler Pipe/Hose Replacement).

21. Install the power steering gear to the frame. Refer to Steering Gear Replacement   (See: Steering and Suspension/Steering/Steering Gear/Service

and Repair).

22. Install the power steering gear bolts. Refer to Steering Gear Replacement   (See: Steering and Suspension/Steering/Steering Gear/Service and

Repair).

23. Install the power steering gear heat shield. Refer to Steering Gear Heat Shield Replacement   (See: Steering and Suspension/Steering/Steering

Gear/Service and Repair).

Front Subframe|Service and Repair|Page 11758 > < Front Subframe|Service and Repair|Page 11756