V 20 P/U 4WD V8-379 6.2L DSL (1988)
Shift Cable: Adjustments
New Process Model 208 & 241
Fig. 2 Transfer case shift linkage
1.
Position transfer case shift lever in 4 Hi detent.
2.
Push lower shifter lever forward to 4 Hi stop, then install rod swivel into shift lever hole.
3.
Install .20 inch gage behind swivel as shown, Fig. 2.
4.
With shifter against 4 Hi stop, tighten rod nut (A) until it contacts gage.
5.
Remove gage, then push swivel rearward against nut (A) and tighten nut (B).