300 SRT-8 V8-6.1L VIN W (2005)
1. Position the retractor (4) on the C-pillar to the indexing tab slips up into the pillar.
2. Install the retractor mounting bolt (3). Torque bolt to 32 N.m (24 ft. lbs.).
3. Install the one upper turning loop retaining bolt (2). Torque bolt to 40 N.m (30 ft. lbs.).
4. Install the upper C-pillar trim panel.