Aspen 4WD V8-5.7L Hybrid (2009)
Transmission Cooler: Service and Repair
Installation
INSTALLATION
1. Position the transmission cooler in the vehicle.
2. Install the lower transmission cooler mounting bolt. Tighten to 10 Nm (90 in. lbs.)
3. Connect the transmission cooler lines.
4. Lower the vehicle.
5. Install the upper transmission cooler mounting bolt. Tighten bolt to 10 Nm (90 in. lbs.).
6. Install the upper condenser/radiator seal.
7. Check the transmission fluid level , , and See: Service and Repair/Procedures.