chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Additional Information|Page 1670 > < Additional Information|Page 1668
Page 3
background image

9. Remove clips attaching EGR tubes to intake manifold.

10. Remove bolts attaching intake manifold and remove manifold.

INSTALLATION

1. Clean and inspect gasket sealing surfaces.

NOTE:  Intake gaskets can be reused, provided they are free of cuts or tears.

2. Inspect gasket for cuts or tears. Replace gaskets as necessary.
3. Install intake manifold and hand start all attaching bolts.

Fig. 53

4. Tighten bolts gradually in sequence shown in (Fig. 53) until a torque of 12 Nm (105 in. lbs.) is obtained.
5. Install right side (Fig. 50) and left side (Fig. 51) intake manifold supports.
6. Install manifold support brackets at front corners and at MTV (Fig. 52).
7. Tighten fastener attaching throttle body to support bracket.
8. Connect vacuum lines to the following:

-

Secondary Runner Valve (SRV) Reservoir

-

Speed Control Reservoir

-

Positive Crankcase Ventilation (PCV) Valve

-

Proportional Purge Solenoid

-

Power Brake Booster

9. Connect electrical connectors to the following:

-

Secondary Runner Valve (SRV)

-

Manifold Tuning Valve (MTV)

-

Throttle Position Sensor (TPS)

-

Idle Air Control (IAC)

-

Intake Air Temperature/Manifold Absolute Pressure (TMAP)

-

Vacuum Reservoir Solenoid

10. Install EGR tubes to intake manifold.
11. Install throttle and speed control cables to bracket and throttle arm.
12. Install air cleaner housing and inlet tube.
13. Connect negative cable to remote jumper terminal.

Additional Information|Page 1670 > < Additional Information|Page 1668