chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Trunk / Liftgate Switch|Service and Repair > < Exterior Handle Switch|Page 7168
Page 1
background image

Trunk / Liftgate Switch: Testing and Inspection

The full open switch is a normally closed micro-switch. To test proper operation of the full open switch proceed as follows;

1. Using an ohmmeter, test continuity of the switch with the liftgate in the full open position. Continuity should be present. If OK go to Step 2. If not

OK, replace the switch.

2. Test continuity of the switch while depressing the full open switch contact arm. Continuity should not be present. If not OK, replace the switch.

Trunk / Liftgate Switch|Service and Repair > < Exterior Handle Switch|Page 7168