PT Cruiser L4-2.4L (2008)
4. Install upper intake manifold to cylinder head support bracket (1). Torque cylinder head fasteners to 28 Nm (250 in. lbs.) and manifold fasteners to
6 Nm (55 in. lbs.).
5. Install the intake manifold cover (1).
6. Connect purge solenoid hose to throttle body (1).