chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Balance Shaft Carrier - Removal|Page 2217 > < Balance Shaft Carrier - Removal|Page 2215
Page 1
background image

Balance Shaft: Service and Repair
Balance Shaft Carrier - Installation

INSTALLATION

BALANCE SHAFT INSTALLATION/TIMING

Balance shaft (6) and carrier (4) assembly installation is the reverse of the removal procedure. During installation crankshaft-to-balance shaft timing
must be established. Refer to Timing procedure.
 

1. With balance shafts (6) installed in carrier (4) position carrier on crankcase and install four attaching bolts and tighten to 54 Nm (40 ft. lbs.).

2. Turn balance shafts until both shaft key ways are up (1), parallel to vertical centerline of engine. Install short hub drive gear on sprocket driven

shaft and long hub gear on gear driven shaft. After installation gear and balance shaft keyways must be up (1) with gear timing marks meshed (2)
as shown.

3. Install gear cover and tighten double ended stud/washer fastener to 12 Nm (105 in. lbs.).

Balance Shaft Carrier - Removal|Page 2217 > < Balance Shaft Carrier - Removal|Page 2215