PT Cruiser L4-2.4L (2008)
4. Install the four mounting bolts to the PCM mounting bracket (1) and tighten to 10.7 Nm (95 in. lbs.).
5. Relocate and install the clutch reservoir.
NOTE: The electrical connector for the PCM are COLOR Coded.
6. Connect and lock the 3 or 4 electrical connectors (1) to the Powertrain Control Module (PCM).
7. Install plastic clips that hold the wiring harness to the support bracket.
8. Connect the negative battery cable.