PT Cruiser L4-2.4L Turbo (2009)
6. Tighten the flared fittings to 31 Nm (23 ft. lbs.).
7. Lower the vehicle.
OIL RETURN LINE
NOTE: If drain back nipple is not damaged or showing signs of leakage, steps 2, 3, 4, and 9 can be skipped.
1. Clean gasket surfaces.
2. Using a paint pen, mark the new drain back nipple to a depth of 17 mm (0.669in.) from the end to be installed in block.
3. Apply MOPAR(R) Stud'n Bearing mount and adhesive to the drain back nipple.
4. Using Bearing Installer 9723, install the drainback nipple.
5. Install the oil return line hose over the drain back nipple.
6. Install a new gasket.
7. Install the two fasteners securing the oil return tube to the turbocharger. Tighten the fasteners to 12 Nm (105 in. lbs.).
8. Perform oil change.See: Engine Oil/Service and Repair
9. Lower the vehicle.