PT Cruiser L4-2.4L Turbo VIN 8 (2005)
Shift Cable: Service and Repair
T350
GEAR SHIFT CABLE
REMOVAL
NOTE: The crossover and selector cables are manufactured as a cable assembly and cannot be serviced individually.
1. Pull up on gearshift knob with moderate force to remove from gearshift mechanism (Fig. 100).
2. Remove shifter boot/bezel assembly from console by lifting up at mounting ring area (Fig. 101).