chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Electrical - Power Windows/Convertible Top Inop|Page 8991 > < Electrical - Power Windows/Convertible Top Inop
Page 2
background image

PARTS REQUIRED:

SPECIAL TOOLS/EQUIPMENT REQUIRED:

REPAIR PROCEDURE:

Module Resetting

1.

Open both doors (provides a faster voltage decay in the SGMs)

2.

**Disconnect and isolate the negative battery cable.

3.

Keep the battery disconnected for a minimum of 15 minutes.

4.

Reconnect the negative battery cable.**

5.

Turn the ignition switch to the ON position, and try each of the four window switches to confirm operation.

6.

If all windows move, then proceed to the Module Identification procedure. If the lock-up condition is still present on either side of the vehicle, or
both, repeat steps 1 through 4, lengthening the time to 30 minutes.

SGM Reprogramming

NOTE:

Whenever a module is reprogrammed, the software in the DRBIII(R); must be programmed with the latest revision level available.

NOTE:

If this flash process is interrupted/aborted, the flash process should be restarted and then follow the directions on the DRBIII(R).

1.

Before beginning the flash procedure, remove any old flash files from the DRBIII(R) memory. To clear the memory from the MAIN MENU:

a.

Simultaneously press the "MORE" and "YES" keys.

b.

A screen will appear requesting a "COLD BOOT".

c.

Follow the on screen instructions by selecting the "F4" key.

d.

When the DRBIII(R) reboots to the MAIN MENU, proceed to Step # 2.

NOTE:

Drivers Door" and "Passenger Door" in the DRBIII(R) display refers to the corresponding SGM's.

Electrical - Power Windows/Convertible Top Inop|Page 8991 > < Electrical - Power Windows/Convertible Top Inop