Sebring Convertible V6-2.7L Flex Fuel (2008)
![background image](/chrysler/sebring_convertible/v6-2.7l_flex_fuel/Page-1634008.png)
15. Remove remaining retainers (1, 2).
16. Remove valves and springs.
NOTE: Refer to Valve Body Cleaning and Inspection for cleaning procedures.
Assembly
ASSEMBLY
15. Remove remaining retainers (1, 2).
16. Remove valves and springs.
NOTE: Refer to Valve Body Cleaning and Inspection for cleaning procedures.
Assembly
ASSEMBLY