Sebring Sedan L4-2.4L VIN J (2004)
4. Insert servo studs through holes in speed control cable and mounting bracket.
5. Install nuts, tighten to 6.7 Nm (60 in. lbs.).
6. Install servo and bracket to stud plate in shocktower and tighten nuts.
7. Connect negative battery cable.