chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Sound Proofing / Insulation > < Power Liftgate Full Open Switch - Removal|Page 12159
Page 2
background image

4. Insert the full open switch wire terminals (2) into the liftgate drive unit connector (1) ensuring the proper terminal location as noted in the full open

switch removal procedure.

5. Install the power liftgate drive unit assembly on the vehicle,See: Doors, Hood and Trunk/Trunk / Liftgate/Trunk / Liftgate Motor/Service and

Repair/Power Liftgate Drive Unit - Installation.

6. Connect the battery negative cable.
7. Using an appropriate scan tool, check and erase any power liftgate control module diagnostic trouble codes.
8. Perform the power liftgate learn cycle,See: Doors, Hood and Trunk/Trunk / Liftgate/Service and Repair/Procedures/Power Liftgate Learn Cycle.
9. Verify power liftgate system operation.

Sound Proofing / Insulation > < Power Liftgate Full Open Switch - Removal|Page 12159