daewoo Workshop Repair Guides

Daewoo Workshop Service and Repair Manuals

Starter Motor > < Diagnostic Trouble Code Tests and Associated Procedures|Page 3244
Page 3
background image

Tighten the shift control cable linkage retaining nut to 15 Nm (11 ft. lbs.).
Tighten the fluid filler tube bracket retaining nut to 15 Nm (11 ft. lbs.).

5. Connect the PNP switch electrical connector to the wiring harness.
6. Install the battery and battery tray.

Starter Motor > < Diagnostic Trouble Code Tests and Associated Procedures|Page 3244