Nubira SX Hatchback L4-2.0L DOHC D-TEC MFI (1999)
6. Install the band clamp bolt.
Tighten
Tighten the band clamp bolt to 5 Nm (44 lb.in).
7. Connect the negative battery cable.
8. Evacuate and recharge the A/C system.
6. Install the band clamp bolt.
Tighten
Tighten the band clamp bolt to 5 Nm (44 lb.in).
7. Connect the negative battery cable.
8. Evacuate and recharge the A/C system.