Nubira SX Wagon L4-2.0L DOHC D-TEC MFI (1999)
10. Install the throttle cable bracket.
11. Install the throttle cable bracket bolts.
Tighten the throttle cable bracket bolts to 8 Nm (71 inch lbs.).
12. Connect the throttle cable to the intake manifold and the throttle body.
13. Connect all of the necessary vacuum lines that were previously disconnected.
14. Connect the MAP sensor connector.
15. Connect the coolant hoses to the throttle body.
16. Connect the idle air control valve connector.
17. Connect the throttle position sensor connector.
18. Connect the air intake tube to the throttle body.
19. Connect the intake air temperature sensor connector.
20. Connect the evaporative emission canister purge solenoid at the intake manifold and tighten the bracket bolt.
Tighten the evaporative emission canister purge solenoid bracket bolt to 5 Nm (44 inch lbs.).
21. Install the fuel pump fuse.
22. Connect the negative battery cable.