Nubira SX Wagon L4-2.0L DOHC D-TEC MFI (1999)
7. Connect the TP sensor connector and the IAC valve connector.
8. Connect the coolant hoses to the throttle body.
9. Connect the vacuum hoses to the throttle body.
IMPORTANT: Make sure the throttle/cruise control cables do not hold the throttle open. With the engine OFF, check to see that the accelerator
pedal is free.
10. Connect the throttle/cruise cables.
11. Install the air intake tube.
12. Connect the breather hose to the valve cover.
13. Connect the IAT sensor connector.
14. Connect the negative battery cable.
15. Fill the cooling system.