3500 4x4 Pickup V10-488 8.0L Magnum (1994)
8.
After removal, transfer the existing head components (valves and valve springs) from the old head to the new head. Refer to Page 9-121.
9.
Install the new cylinder heads following the procedure given on Page 9-120.
10.
Install the fuel rail assembly as outlined on Page 14-80.
11.
Install the air cleaner assembly.
12.
Refill the cooling system.
13.
Connect the negative battery.
POLICY: Reimbursable within the provisions of the warranty.
TIME ALLOWANCE:
Labor Operation No:
09-35-01-99
6.9 Hrs.
Optional Equipment:
09-35-01-64 Air Pump
0.4 Hrs.
FAILURE CODE: P8 - New Part