Aries L4-135 2.2L SOHC (1983)
FIGURE 2-D
4.
Insert two bare terminals on instrument panel overlay harness, PN 4331801, into the instrument panel side of the bulkhead connector as
shown in Figure 2-D and outlined below:
a.
Yellow wire into cavity #9.
b.
Gray with black tracer wire into cavity #34.
FIGURE 2-A - INSTRUMENT PANEL WIRING
5.
Connect the natural colored 1-way connector (on overlay harness, PN 4331801) to the loose natural colored 1-way connector that was
installed on the wire removed from cavity #9 of the instrument panel side of the bulkhead connector in Step 3 (Figure 2-A).
6.
Route instrument panel overlay harness, PN 4331801, along the main instrument panel wiring harness and secure with three tie wraps, PN
6015756, as shown in Figure 2-A.