Avenger V6-2.5L VIN N (1998)
Transmission Control System Relay: Testing and Inspection
EATX RELAY CHECK
1. Remove the EATX relay.
2. Check the continuity between the EATX relay terminals 4 and 6.
3. Use jumper leads to connect EATX relay terminal 4 to the battery (+) terminal and terminal 6 to the battery terminal.
4. Check the continuity between EATX relay terminals 2 and 8 while connecting and disconnecting the jumper lead at the battery (-) terminal.
5. If there is a defect, replace the EATX relay.