B250 3/4 Ton Van V8-318 5.2L VIN T FI (1992)
8. Install the intake manifold bolts and tighten as follows:
Intake Manifold Bolt Tightening Sequence (V-8)
Step 1 - Tighten bolts 1 through 4, in sequence, to 8 Nm (72 in. lbs.) torque. Tighten in alternating steps 1.4 Nm (12 in. lbs.) torque at a time.
Step 2 - Tighten bolts 5 through 12, in sequence, to 8 Nm (72 in. lbs.) torque.
Step 3 - Check that all bolts are tighten to 8 Nm (72 in. lbs.) torque.
Step 4 - Tighten all bolts, in sequence, to 16 Nm (12 ft. lbs.) torque.
Step 5 - Check that all bolts are tighten to 16 Nm (12 ft. lbs.) torque.
9. Install closed crankcase ventilation and evaporation control systems.
10. Connect the coil wires.
11. Connect the heat indicator sending unit wire.
12. Connect the heater hoses and bypass hose.
13. Install distributor cap and wires.
14. Hook up-the return spring.
15. Connect the accelerator linkage and if so equipped, the speed control and transmission kick-down cables.
16. Install the fuel lines.
17. Install the generator and drive belt. Tighten generator mounting bolt to 41 Nm (30 ft. lbs.) torque. Tighten the adjusting strap bolt to 23 Nm (200
in. lbs.) torque.
18. Install the air cleaner.
19. Install the engine cover.
20. Fill cooling system.
21. Connect the negative cable to the battery.