B250 3/4 Ton Van V8-360 5.9L VIN T 4-bbl (1982)
5.
Lubricate splines with automatic transmission fluid.
6.
Reinstall driveshaft.
7.
Lower vehicle and road test.
POLICY:
Reimbursable within the provisions of the warranty
TIME ALLOWANCE:
Labor Operation No.
16-30-10-01................................ 0.6 Hrs.
Refer to Labor Operation Time Schedule
FAILURE CODE:
52 - Improperly Machined