B350 1 Ton Van V8-360 5.9L (1994)
a. Tighten rocker arm bolts to 28 Nm (21 ft-lbs).
b. Do not crank engine during or immediately after rocker arm installation. Allow up to 20 minutes for hydraulic roller tappets to bleed down.
a. Tighten rocker arm bolts to 28 Nm (21 ft-lbs).
b. Do not crank engine during or immediately after rocker arm installation. Allow up to 20 minutes for hydraulic roller tappets to bleed down.