dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Engine Timing Cover(s) - Removal|Page 1954 > < Engine Timing Cover(s) - Removal|Page 1952
Page 1
background image

Timing Cover: Service and Repair
Engine Timing Cover(s) - Installation

INSTALLATION

NOTE: When using RTV, the sealing surfaces must be clean and free from grease and oil.

NOTE: When using RTV, parts should be assembled in 10 minutes and tighten to final torque within 45 minutes.

1. Clean all sealing surfaces See: Service and Repair/Procedures/Engine Gasket Surface Preparation.
2. Apply Mopar(R) engine sealant RTV (or equivalent) as shown at the cylinder head to block parting line (1,2).

3. Apply Mopar(R) engine sealant RTV (or equivalent) as shown at the ladder frame to block parting line (1,2).

Engine Timing Cover(s) - Removal|Page 1954 > < Engine Timing Cover(s) - Removal|Page 1952