Caravan FWD V6-3.3L VIN 3 Flex Fuel (2001)
4. Install the tripod assembly onto the interconnecting shaft (Fig. 15).
5. Install the snap-ring to hold the tripod assembly onto the interconnecting shaft (Fig. 16).
6. Install the new large diameter retaining clamp onto the CV joint housing.
7. Distribute 1/2 the amount of grease provided in the seal boot service package (DO NOT USE ANY OTHER TYPE OF GREASE) into tripod
housing. Put the remaining amount into the sealing boot.