Charger V6-3.5L (2009)
7. Install tunnel reinforcement (2) and nuts (1). Tighten nuts to 25 Nm (215 in. lbs.)
8. Check clearance between muffler and resonator assembly and fuel tank. Clearance is 14mm (.55 in.) for V8 engine and 16mm (.62 in.) for V6
engine.
9. Check clearance at rear tunnel reinforcement. Clearance is 15 - 20mm (.59 -.78 in.).
10. The tailpipe should be centered in the rear fascia opening.
11. Adjust clearance as necessary.
12. Lower vehicle.
13. Start the engine and inspect for exhaust leaks. Repair exhaust leaks as necessary.