Charger V6-3.5L (2009)
4. Reconnect the two wire harness connectors (1 and 2) to the ORC connector receptacles located on the rearward facing side of the module. Be
certain that the latches on both connectors are each fully engaged.
5. Reinstall the center floor console onto the top of the floor panel transmission tunnel. See: Body and Frame/Interior Moulding /
Trim/Console/Service and Repair/Floor Console - Installation.
6. Do not reconnect the battery negative cable at this time. The Supplemental Restraint System (SRS) verification test procedure should be performed
following service of any SRS component. See: Service and Repair.