Charger V6-3.5L (2009)
6. Lubricate and install the 1-2 / 4-5 Command valve assembly (1), 1-2 / 4-5 Holding Pressure Shift Valve (2) and the 1-2 / 4-5 Shift Pressure
assembly (3) into the valve body.
7. Install the side cover and the screws holding the side cover (4) to the valve body and valve housing. Tighten the screws to 4 Nm (35 in.lbs.).