Charger SRT-8 V8-6.1L (2009)
1. Install the speed control switch (1) to steering column control module (2) (SCCM).
2. If equipped with ESP, install the steering angle sensor (1) and phillips head screw (2) to SCCM. Tighten phillips head screw to.7 Nm (6 in. lbs.).
If not equipped with ESP, install the plastic insert and phillips head screw to steering column. Tighten phillips head screw to.7 Nm (6 in. lbs.).