Charger SRT-8 V8-6.1L (2009)
Timing Cover: Service and Repair
Engine Timing Cover(s) - Installation
INSTALLATION
1. Clean timing chain cover and block surface.
NOTE: Always install a new gasket on timing cover.
2. Verify that the slide bushings (1) are installed in timing cover.
3. Install cover and new gasket. Tighten fasteners to 28 Nm (250 in. lbs.).
NOTE: The large lifting stud is torqued to 55 Nm (40 ft. lbs.).
4. Install the oil pan and pick up tube. See: Engine Lubrication/Oil Pan/Service and Repair/Engine Oil Pan - Installation
5. Install the A/C compressor. See: Heating and Air Conditioning/Compressor HVAC/Service and Repair/A/C Compressor - Installation
6. Install the generator. See: Starting and Charging/Charging System/Alternator/Service and Repair/Generator - Installation
7. Install power steering pump. See: Steering and Suspension/Steering/Power Steering/Power Steering Pump/Service and Repair/Power Steering
Pump - Installation
8. Install the dipstick support bolt.
9. Install the thermostat housing.