Charger SRT-8 V8-6.1L (2009)
Heat Shield: Service and Repair
Installation
INSTALLATION
1. Position heat shields (1).
2. Install nuts (2). Tighten nuts to 10 Nm (98 in. lbs.).
Heat Shield: Service and Repair
Installation
INSTALLATION
1. Position heat shields (1).
2. Install nuts (2). Tighten nuts to 10 Nm (98 in. lbs.).