Charger SRT-8 V8-6.1L (2009)
8. Again verify halfshaft inner joints are fully engaged to axle assembly.
9. Remove transmission jack (1).
10. If used, remove screw-type under-hoist jack stands (2).
11. Torque propeller shaft coupler-to-axle flange bolt/nuts to 58 Nm (43 ft. lbs.).
12. Using a 14mm hex, remove rear axle fill plug (1). Fill axle with Mopar(R) 75W-140 Synthetic Gear AND Axle Lubricant in the following
quantities:
-
198 Axle: 1.4L (1.5 qts.)
-
210 Axle: 1.6L (1.7 qts.)