D 100 Pickup V8-360 5.9L (1984)
INSTRUMENT PANEL WIRING
2.
Disconnect the arced grey 7-way ignition switch connectors and remove the orange wire from the instrument panel side (Figure 2-B).
Install the orange wire just removed, into the natural colored 1-way connector supplied with the instrument panel overlay harness, PN
4362284.
Install the bare terminal (orange wire) from the instrument panel overlay harness into the previously vacated cavity in the ignition switch
connector. Reconnect the natural colored one way connectors supplied with the instrument panel overlay harness, and reconnect the
ignition switch connectors (Figures 2-B and 2-C).
INSTRUMENT PANEL WIRING
3.
Replace the 3-amp fuse located in cavity #11 of the fuse block with the 10-amp fuse supplied in kit (Figure 2-D).