Dakota Quad Cab 2WD V8-5.9L VIN Z LDC (2002)
replaced.
8. Install distributor and distributor drive shaft.
9. Install push rods and tappets.
10. Install rocker arms.
11. Install timing case cover.
12. Install cylinder head covers.
13. Install intake manifold.
14. Install the engine cover.
15. Install the A/C Condenser (if equipped)
16. Install the radiator.
17. Start engine check for leaks.