dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Positive Crankcase Ventilation > < EGR Valve - Removal|Page 3979
Page 2
background image

9. Do a final tightening of two EGR tube bolts (4). Torque to 11 Nm (8.5 ft. lbs.).

10. Install windshield wiper motor.
11. Install plastic windshield cowl panel.
12. Connect negative battery cable.
13. Using a diagnostic scan tool, erase any previously recorded DTC's (Diagnostic Trouble Codes).

Positive Crankcase Ventilation > < EGR Valve - Removal|Page 3979