dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Shift Cable, A/T|Service and Repair > < 42/44RE (A500) 4-Speed
Page 1
background image

Shift Cable: Adjustments
46RE (A518) 4-Speed

GEARSHIFT CABLE

Check adjustment by starting the engine in Park and Neutral. Adjustment is OK if the engine starts only in these positions. Adjustment is incorrect if
the engine starts in one but not both positions. If the engine starts in any position other than Park or Neutral, or if the engine will not start at all, the
park/ neutral position switch may be faulty.

Gearshift Adjustment Procedure
1. Shift transmission into Park.

Gearshift Cable Routing

2. Release cable adjuster lock (underneath the power brake booster) to unlock cable.
3. Raise vehicle.
4. Slide cable eyelet off transmission shift lever.
5. Verify transmission shift lever is in Park detent by moving lever fully rearward. Last rearward detent is Park position.
6. Verify positive engagement of transmission park lock by attempting to rotate propeller shaft. Shaft will not rotate when park lock is engaged.
7. Slide cable eyelet onto transmission shift lever.
8. Lower vehicle and check engine starting. Engine should start only in Park and Neutral.
9. Lock shift cable by pressing cable adjuster clamp down until it snaps into place.

Shift Cable, A/T|Service and Repair > < 42/44RE (A500) 4-Speed