Grand Caravan V6-3.3L Flex Fuel (2008)
3. Install input speed sensor (1)and torque to 27 Nm (20 ft. lbs.).
4. Connect input speed sensor connector (2).
5. Install solenoid/pressure switch 8-way connector and torque to 4 Nm (35 in. lbs.).
6. Install air cleaner assembly.
7. Connect battery negative cable.
8. If solenoid/pressure switch assembly was replaced, perform the "Quick-Learn" procedureSee: Computers and Control Systems/Testing and
Inspection/Programming and Relearning.