Grand Caravan V6-3.3L Flex Fuel (2008)
4. Install the WIN (2) and install the mounting screws (1).
5. Connect the electrical connectors (3, 4) at the WIN (1) and the shifter (2).
6. Install the I/P cover (3).
4. Install the WIN (2) and install the mounting screws (1).
5. Connect the electrical connectors (3, 4) at the WIN (1) and the shifter (2).
6. Install the I/P cover (3).