Grand Caravan V6-4.0L (2008)
3. Push the plastic retainer (1) down to lock the link rod mounting sphere (2) into position for both ends of the link rod.
4. Install the D-pillar trim on the vehicle.See: Interior Moulding / Trim/Trim Panel/Service and Repair/Pillar Trim/D-Pillar Trim/Installation for the
procedure.
5. Perform the power liftgate learn cycle,See: Service and Repair/Procedures/Power Liftgate Learn Cycle.