Grand Caravan AWD V6-3.8L VIN L (2001)
3. Install the inner half shaft retaining bolts (Fig. 5). Torque the bolts to 61 Nm (45 ft.1bs.).
4. Install the half shaft washer and hub nut. Torque the hub nut to 244 Nm (180 ft. lbs.)
5. Install the wave washer, nut lock, and a new cotter pin (Fig. 6). Be sure to wrap the cotter pin prongs tightly around the hub nut lock.
6. Install rear wheel. Torque the lug nuts to 135 Nm (100 ft. lbs.).