dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Control Module HVAC > < Control Assembly, HVAC|Diagrams|Connector Views|Page 6624
Page 2
background image

4. Install the ash receiver assembly if necessary.
5. Connect the negative battery cable remote terminal to the remote battery post.
6. To allow the BCM to learn the new control head, perform HVAC system calibration. Refer to Heating & Air Conditioning / Testing and

Inspection / Non-Trouble Code Procedures / HVAC System Calibration. See: Testing and Inspection

Control Module HVAC > < Control Assembly, HVAC|Diagrams|Connector Views|Page 6624