dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Shift Interlock Cable|Adjustments|Page 5075 > < Shift Interlock Cable|Adjustments|Page 5073
Page 4
background image

11. Depress the lock tab (Fig. 353) on the interlock cable and pull the cable out of the lock cylinder housing (Fig. 354).
12. Remove interlock cable. Note cable routing so it can be installed in the same manner.

INSTALLATION 

1. Ensure ignition switch is in the "ON/RUN" position (Fig. 355).
2. Route the interlock cable into position as previously removed.
3. Slide the steering column end of the interlock cable into the lock cylinder housing until it snaps into place (Fig. 354).
4. Connect BTSI solenoid connector.
5. Turn the ignition key to the "LOCK" position (Fig. 355).
6. Put the shifter in the PARK position.
7. Slide the interlock cable core wire into the groove on the lever (Fig. 352). Ensure the cable end seats in the groove.
8. Slip the cable into the shifter housing until it snaps into place.
9. Ensure the shift lever remains in PARK. Move the ignition key to the "LOCK" position and remove the key Tilt the steering column to the full UP

position.

10. If the interlock cable is being replaced, remove the lock pin. Allow the cable to adjust itself to the correct position. Tighten the locking clip (Fig.

352) by pushing it down.

11. If the interlock cable is being re-used, the lock pin will not exist. Free adjustment by pulling outward on locking clip. The cable will index itself to

the correct position. Tighten the locking clip by pushing it down.

12. Insert the ignition key and verify the ignition interlock adjustment/operation. If adjustment is necessary, refer to Adjustments.
13. Install the bezel on the shifter console.
14. Install gearshift knob (Fig. 348).
15. Install upper and lower covers from the steering column.
16. Install tilt lever (Fig. 350).

Shift Interlock Cable|Adjustments|Page 5075 > < Shift Interlock Cable|Adjustments|Page 5073