dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Battery Cable|Service and Repair > < Recall - Bulkhead Battery Cable Stud Torque Inspection|Page 4762
Page 5
background image

7. Remove the right front wheelhouse splash shield to gain access to the battery positive cable bulkhead outside terminal. Connect the voltmeter to

measure between the battery positive cable bulkhead outside terminal and the starter solenoid B(+) terminal stud. Rotate and hold the ignition
switch in the Start position. Observe the voltmeter. If the reading is above 0.2 volt, clean and tighten the battery positive cable bulkhead outside
terminal connection. Repeat the test. If the reading is still above 0.2 volt, replace the battery front positive cable.

8. Remove the right front carpet to gain access to the battery positive cable bulkhead inside terminal. Connect the voltmeter to measure between the

battery positive cable terminal clamp and the battery positive cable bulkhead inside terminal connection. Rotate and hold the ignition switch in the
Start position. Observe the voltmeter. If the reading is above 0.2 volt, clean and tighten the battery positive cable bulkhead inside terminal
connection. Repeat the test. If the reading is still above 0.2 volt, replace the battery rear positive cable.

Battery Cable|Service and Repair > < Recall - Bulkhead Battery Cable Stud Torque Inspection|Page 4762