Neon L4-2.0L SOHC (1995)
further action is needed.**
14.
Inspect the areas of contact and bend the shield to provide more clearance:
^
Measure between the "I" pipe and the heat shield in the areas showing contact marks, there should be a minimum clearance of 25 mm (Figure
3).
In the areas that are out of specification, use a pair of pliers to bend the heat shield to provide the proper clearance (Figure 3).
^
Measure between the heat shield and the floor pan in the areas showing contact marks, there should be a minimum of 5 mm clearance (Figure
3).
^
In the areas that are out of specification, use a pair of pliers to bend the heat shield to provide the proper clearance (Figure 3).
CAUTION:
DO NOT BEND THE HEAT SHIELD TO THE EXTENT THAT IT CONTACTS THE BODY OR BECOMES LOOSE.