Neon L4-2.0L SOHC (1995)
ends of the tubing.
9. Secure the wire to the existing ones to prevent chafing or damage to the insulation.
10. Connect the battery and test all affected systems.
ends of the tubing.
9. Secure the wire to the existing ones to prevent chafing or damage to the insulation.
10. Connect the battery and test all affected systems.